Friday, August 17, 2007

Between the basement and the roof...

Mark deciding on how to secure the pipes enclosed in insulation plus downspout. And later, reviewing the job. Above right, see a closeup of the pipes as they reach for the roofline.Here's the other end of the pipes, entering the basement, thru the same window frame as our DSL line!

No comments: